Project inputs
Use and layoutOccupancy, room count, and whether the stay is temporary or longer
SizeFootprint, eave height, and transport envelope in ft or m
LoadsDesign live load, design dead load, wind speed in mph, ground snow load in psf, seismic design category
Commercial lines kept apart
Building packageFrame, floor, roof, wall, openings, and interior finish level
Site packageFoundation interface, crane, utilities, and who pulls the permit
DocumentsDrawings, calculations, and the cited edition of IBC, ASCE 7, AISC 360, AWS D1.1, IAS AC472, or ISO 9001 if the supplier offers that file
A cited standard is a document to request for the quoted system, the plant, and the project jurisdiction. It is not a badge this desk holds. HUD Code, state modular rules, and an RV standard answer different product types. Mixing them makes the quote comparison false even when the unit count matches.
On 29 October 2026 this page was written as a procurement checklist for that comparison. It records a method, not a completed project and not a supplier award.